in
Innovasys Logo

Copy of the glossary

Last post 06-11-2008 6:10 AM by mreisbeck. 2 replies.
Page 1 of 1 (3 items)
Sort Posts: Previous Next
  • 06-11-2008 5:25 AM

    • mreisbeck
    • Top 50 Contributor
    • Joined on 04-24-2008
    • Frankfurt/M.
    • Posts 5

    Copy of the glossary

    Hi folks.

    Does anybody know a procedure to copy the glossary from one project to the other, without importing the whole project?

    Many thanks for thinking about!
    Martin

    Filed under:
  • 06-11-2008 6:00 AM In reply to

    Re: Copy of the glossary

    Hello Martin,

    If you are adding to the existing Glossary then you can select Glossary Items in the Import Dialog. If this option isn't available in the Import dialog can you download the latest setup as this contains the refined Import Options.

    Regards. 

    Mike Shaw
    Innovasys
    http://www.innovasys.com
  • 06-11-2008 6:10 AM In reply to

    • mreisbeck
    • Top 50 Contributor
    • Joined on 04-24-2008
    • Frankfurt/M.
    • Posts 5

    Re: Copy of the glossary

    Embarrassed Thank you for answering stupid questions! I couldn' t imagine, that this case is so easy...

Page 1 of 1 (3 items)